Sustainable development

Implementation of ESG-princips
using the example of
"eastern exit"
Since the beginning of the construction, the project concessionaire - BKK LLC - is guided by ESG -princes and strives to achieve balance between environmental, social and economic aspects.
ESG (environmental, social, corporate governance) —
Ecology, social policy and corporate administration.In relation to companies, they mean their involvement in the solution of environmental, social and managerial problems.
The approach to the adoption of management decisions in the company is based on consistency with universal values, solving socio-economic problems, preserving the favorable environment and natural resource potential, including for future generations.
Separate references deserve decisions selected by the “Bashkir concession company” to rationalize the use of natural resources both at the stage of construction of the “Eastern Exit” and at the stage of its operation.For example, at the construction stage, it was possible to reduce the specific consumption of water by 28.2%, the amount of waste generated due to their shipping or secondary use was reduced by 20%.
Also, within the framework of the program of environmental compensation measures, which is implemented during the construction of the Eastern Exit (from 2020 to 4 square meters, 2023), 794,328 fry of red -Book sterlet were produced on a regular basis..
Measures taken by the concessionaire in terms of maintaining the environmental balance at the construction stage of the facility
Схема 1. Сокращение объема отходов
production waste
and consumption
system of waste for further
secondary processing, includingsoil,
metal, forestry residues
research for
class establishing
waste
Scheme 2. Protection of atmospheric air
research for
class establishing
transportation and
loading of goods
the period of forced downtime or
technical break (parking
techniques only with the engine turned off)
air protection
Scheme 3. Reducing greenhouse gas emissions
forced downtime or technical
break (parking of equipment only with
engine turned off)
“Vostochny Departure”: Placement
concrete and asphalt plants on
facility minimized the distance,
overcame over the large -sized
transportation of materials to the construction site,
and reduced emissions into the environment
greenhouse gases
Scheme 4. Preservation of biological diversity
installation work, taking into account
restrictions established by
spawning period
storage of the removed
plant layer of soil and
ensuring its storage for
further use
and shrubs outside the limits of
stripes allotted under
the construction of the road
sites in structures,
limiting the hit
animals within
construction sites
diversity
Scheme 5. Protection of aquatic ecosystems
water supply system
for washing wheels when leaving
from the construction site
sites.
water in storage containers
with the subsequent export to
City treatment facilities.
fences in the production of
on the floodplain and in the channel of water
objects
water bodies
Scheme 6. Protection of groundwater
technology and vehicles
from solid coatings
waterproof coatings
in places of long -term
standing technology
waste in waterproofed
drives and attendants with
subsequent export
waterproofed
tanks for gathering waste
water, followed by the export to
city treatment facilities
Measures taken by the concessionaire in terms of maintaining the ecological balance at the operation stage
Atmospheric air protection
The Eastern Exit will allow you to unload the street road network, to reduce the distance overcame by cars traveling to the M5 (and vice versa), respectively, this will help reduce emissions of the main pollutants released during the burning of the fuel by moving vehicles by about 35%.
It is expected to decrease by 27% of greenhouse gas emissions (CO2) released during the burning of fuel by moving vehicles.
Protection of groundwater
During the implementation of the project, 20 local treatment facilities (moos) are equipped and commissioned along the highway highway, on which storm wastewater is cleaned to fisheries and exported by vehicles to the permitted discharge place.
Энергоэффективность проекта
01 —
Effective LED lamps with the optimal combination of parameters were installed: the height and step of lighting supports, the method of installing the lamp on the support in accordance with the dimensions of the roadway.
02 —
Automatic dimming devices have been installed to reduce the power of lamps of the entrance zones of the tunnel
03 —
The optimal sections of cable-wire products were used to reduce electricity losses in group distribution networks
04 —
Additional thermal insulation of the CHC housings was established to reduce electricity costs for heating the internal space of the cabinets
05 —
Automated lighting control system was used
noise absorption
Acoustic screens with a height of 3 to 6 meters have been installed, which have a noise -cutting and noise -absorbing effect.The total length of these structures on the Eastern Exit is 9281 m, an area of more than 30,000 square meters.m. Screens installation areas - the location of the SNT, overpass, pedestrian crossings, interchanges and buildings.The degree of soundproofing of soundproof screens is up to 36 dB and allows you to reduce the noise load to values that do not exceed permissible levels.

“The era of hydrocarbons is not forever with us.The consumption of oil and gas will decrease due to the fact that the world is aimed at reducing the greenhouse effect to slow down the grounding of the Earth.It will require efforts to restructure the economy, the creation of appropriate infrastructure.The President instructed to achieve carbon neutrality of the Russian Federation by 2060.The Government of the Russian Federation approved a strategy for low carbon development. ”
Ivan Chebeskov
Director of the Department of Financial Policy of the Ministry of Finance of the Russian Federation
The socio-economic effect of the commissioning of the "eastern exit"
The emergence of the Eastern Exit is designed to increase the level of development of the transport and logistics potential of Bashkortostan and become a “brick” in the creation of modern Russian transport infrastructure.For the region, this project is a driver of socio-economic development, since it made it possible to create new jobs and an additional database of tax revenues to the budget, and by attracting extra-budgetary investments-to optimize budget expenses.
50%
Builders - residents of Bashkortostan
5 млрд руб.
the volume of contracts with manufacturers and suppliers from the Republic of Belarus
63%
Reducing the load of urban highways and increasing their throughput
The problem of lack of bridges over the Belaya and Ufa rivers is partially solved,
as well as the problem of the absence of highways in the direction from west to east
The growth of transport and logistics...
the potential of Bashkortostan and the creation of modern transport infrastructure
The possibility of developing new ones
new areas and expansion of housing construction in the promising direction of Zauphimya
Increase
investment attractiveness of the Republic of Belarus, an increase in the influx of investment, including in projects implemented by PPP
Increased tax revenues
to the budget of the Republic of Belarus
The possibility of developing new areas
and expansion of housing construction in the promising direction of Zaufimya
Creation
new jobs
Ecology and climate
- Waste reduction plan
- Project Reducing Plan
- Groundwater protection plan
- Plan for preserving biological diversity
- Report on the implementation of environmental protection measures for 2020
- Pond of greenhouse gas emissions plan
- Project reduction plan
- Atmospheric air protection plan
- Aquatic ecosystem protection plan
The quality of life
- Block diagram Operating quality control
- Block diagram Acceptance of work performed
- Letter protection of cultural heritage objects
- Quality control program
- List of measures to improve working conditions_2021
- OOS's block diagram
- GKU of architecture and urban planning
- Management manual for the quality of work
- Report on the implementation of environmental measures for 2020